MMT January Observing Statistics
Leave a CommentTime Summary
Percentage of time scheduled for observing 90.2 Percentage of time scheduled for engineering 9.8 Percentage of time scheduled for sec/instr change 0.0 Percentage of time lost to weather 45.1 Percentage of time lost to instrument 0.5 Percentage of time lost to telescope 2.8 Percentage of time lost to general facility 0.0 Percentage of time lost to environment (non-weather) 0.0 Percentage of time lost 48.4
——–
Breakdown of time lost to telescope: secondary (f/15 problem),
pointing/computer problem with AO, PCR server, wfs camera,
M1 panic, computer