Leave a Comment Percentage of time scheduled for observing 90.0
Percentage of time scheduled for engineering 10.0
Percentage of time scheduled for sec/instr change 0.0
Percentage of time lost to weather 37.8
Percentage of time lost to instrument 2.6
Percentage of time lost to telescope 7.1
Percentage of time lost to general facility 0.1
Percentage of time lost to environment (non-weather) 0.0
Percentage of time lost 47.6
—————
Breakdown of hours lost to telescope:
10.25 Hexapod failure
7.30 M2 (f/15) problems
7.00 AO software
0.50 Gap contamination
0.50 Thin Shell Safety (TSS) issues