Leave a CommentPercentage of time scheduled for observing 96.7
Percentage of time scheduled for engineering 3.3
Percentage of time scheduled for sec/instr change 0.0
Percentage of time lost to weather 26.3
Percentage of time lost to instrument 0.1
Percentage of time lost to telescope 3.7
Percentage of time lost to general facility 0.0
Percentage of time lost to environment (non-weather) 0.0
Percentage of time lost 30.0—————
Breakdown of hours lost to telescope:3.5 WFS5.05 f/15 issues 2.3 SO guider camera